Skip Ribbon Commands
Skip to main content

Chesterton ES

:

Chesterton ES Whole Site Rebuild, CC25-0309-52-00-00

The whole site rebuild consists of the demolition of all permanent buildings and portable classrooms and the construction of 5 new buildings; a new admin building, a multi-purpose/food service building, and 3 new classroom buildings. Site work consists of removal of all existing play structures, landscaping, flatwork, wet and dry utilities, and the installation of new landscaping, wet and dry utilities, flatwork, and play structures. The sitework includes new parking and drop-off areas, trash enclosures, and fencing.
   ​Chesteron ES  WSR                                               PSA Specialist:
   7335 Wheatley Street, San Diego, CA 92111            Maria Cruz   mcruz5@sandi.net   (619) 879-7870

    Pre-Job Meeting Dates:                                                           Bid ad:        10/08/24
        01/29/25                                                                           Bid award:   01/14/25
        ...​​
  
  
  
  
collapse Document Types : Bid Documents ‎(2)
2024-10-08_Bid Advertisement___Chesterton ES WSR.pdf
  
10/10/2024 11:55 AMCruz Maria
Chesterton ES WSR_Sub list.pdf
  
1/16/2025 10:27 AMCruz Maria
collapse Document Types : Letters of Assent (LOA) & Pre-Job Forms (PJCF) ‎(51)
_GC_Level 10 Construction -LOA.pdf
  
1/16/2025 10:27 AMCruz Maria
_GC_Level 10 Construction -PJF (rev -assignment).pdf
  
1/28/2025 2:24 PMCruz Maria
_GC_Level 10 Construction -PJF.pdf
  
1/27/2025 5:56 PMCruz Maria
ACH Mechanical LOA.pdf
  
1/28/2025 10:32 AMCruz Maria
Brady West -PJF.pdf
  
1/27/2025 5:57 PMCruz Maria
Centex Glazing (Glass and Glazing) LOA.pdf
  
1/29/2025 8:54 AMCruz Maria
Centex Glazing (Glass and Glazing) -PJF.pdf
  
1/29/2025 9:01 AMCruz Maria
Christian Brothers LOA.pdf
  
1/27/2025 5:57 PMCruz Maria
Core Contracting LOA.pdf
  
1/27/2025 5:57 PMCruz Maria
Core Contracting -PJF.pdf
  
1/27/2025 5:58 PMCruz Maria
FJ Willert LOA.pdf
  
1/27/2025 5:58 PMCruz Maria
FJ Willert -PJF.pdf
  
1/27/2025 5:58 PMCruz Maria
FJ Willert tier CPL LOA.pdf
  
1/29/2025 10:03 AMCruz Maria
FJ Willert tier CPL -PJF.pdf
  
1/29/2025 10:03 AMCruz Maria
Haxton Mansonry LOA.pdf
  
1/27/2025 5:59 PMCruz Maria
Merino Landscape LOA.pdf
  
1/27/2025 5:59 PMCruz Maria
Merino Landscape -PJF (rev- add equipment).pdf
  
1/29/2025 1:46 PMCruz Maria
Merino Landscape -PJF (rev- clarification on SOW and assignments).pdf
  
1/31/2025 5:01 PMCruz Maria
Merino Landscape -PJF.pdf
  
1/27/2025 5:59 PMCruz Maria
National Electric Works LOA.pdf
  
1/29/2025 12:15 PMCruz Maria
National Electric Works -PJF.pdf
  
1/29/2025 12:15 PMCruz Maria
Pacific Cabinets LOA.pdf
  
1/27/2025 6:00 PMCruz Maria
Pacific Cabinets -PJF.pdf
  
1/29/2025 9:17 AMCruz Maria
Pacific Mobile Structures tier D3 Construction LOA.pdf
  
1/27/2025 6:00 PMCruz Maria
Pacific Mobile Structures tier D3 Construction -PJF.pdf
  
1/27/2025 6:00 PMCruz Maria
Pacific Southwest Structures LOA.pdf
  
1/27/2025 6:01 PMCruz Maria
Pacific Southwest Structures -PJF (rev-add tier).pdf
  
1/28/2025 2:24 PMCruz Maria
Pacific Southwest Structures -PJF.pdf
  
1/27/2025 6:08 PMCruz Maria
Paul J Constr LOA.pdf
  
1/27/2025 6:08 PMCruz Maria
Paul J Constr -PJF.pdf
  
1/27/2025 6:08 PMCruz Maria
RAP Engr LOA.pdf
  
1/27/2025 6:09 PMCruz Maria
RAP Engr -PJF.pdf
  
1/27/2025 6:09 PMCruz Maria
Rocky Coast Bldr LOA.pdf
  
1/27/2025 6:09 PMCruz Maria
Rocky Coast Bldr -PJF.pdf
  
1/27/2025 6:10 PMCruz Maria
Roof Constr dba Chambers Grp LOA.pdf
  
1/27/2025 6:10 PMCruz Maria
Roof Constr dba Chambers Grp -PJF.pdf
  
1/27/2025 6:10 PMCruz Maria
SD Sheet Metal LOA.pdf
  
1/27/2025 6:11 PMCruz Maria
SD Sheet Metal -PJF.pdf
  
1/27/2025 6:11 PMCruz Maria
Standard Elec LOA.pdf
  
1/27/2025 6:11 PMCruz Maria
Standard Elec -PJF.pdf
  
1/27/2025 6:12 PMCruz Maria
Summit Erosion Control LOA.pdf
  
1/27/2025 6:12 PMCruz Maria
Summit Erosion Control -PJF.pdf
  
1/27/2025 6:12 PMCruz Maria
SWS Engineering -LOA.pdf
  
1/28/2025 10:27 AMCruz Maria
SWS Engineering -PJF.pdf
  
1/27/2025 6:12 PMCruz Maria
Team West Contracting LOA.pdf
  
1/28/2025 2:26 PMCruz Maria
Team West Contracting -PJF.pdf
  
1/28/2025 2:27 PMCruz Maria
Watkins Environmental -PJF.pdf
  
1/29/2025 12:14 PMCruz Maria
West-Tech Contracting LOA.pdf
  
1/27/2025 6:13 PMCruz Maria
West-Tech Contracting -PJF (TBD tiers).pdf
  
1/27/2025 6:13 PMCruz Maria
World Bridge Tech LOA.pdf
  
1/27/2025 6:13 PMCruz Maria
World Bridge Tech -PJF.pdf
  
1/27/2025 6:14 PMCruz Maria
collapse Document Types : Pre-Job Conf. (PJC) Meetings ‎(3)
2025-01-29 _PJC Mtg.I_Chesterton ES WSR _Level 10_Attendance Report.pdf
  
1/30/2025 6:12 PMCruz Maria
2025-01-29 _PJC Mtg.I_Chesterton ES WSR _Level 10_Chat.docx
  
1/30/2025 6:04 PMCruz Maria
2025-01-29 _PJC Mtg.I_Chesterton ES WSR _Level 10_Meeting Minutes.pdf
  
1/30/2025 5:34 PMCruz Maria